RB1Read MoreRead Less
Sample RB1 in the resin bound range. Use this code when requesting a sample or sharing a direct finish reference.
- Flooring
- Sample code
- Resin Bound
Supply & installation · Dubai & UAE
DecoPaint supplies and installs resin bound gravel flooring in Dubai, Abu Dhabi and across the UAE. Dried aggregate is mixed with resin and trowelled over a suitable base to form a bound stone surface. For a villa driveway, garden path or commercial walkway, the installation starts with the traffic load, base condition and drainage route before the aggregate blend is chosen.

Installation guide
Commission a resin bound flooring contractor for an installed surface, including assessment, preparation, edge detailing, mixing and laying. A pedestrian path and a vehicle driveway need different specifications. We review the use, levels and existing construction before confirming the proposed system and quote.
An overlay may be possible if the base is stable, sound and suitable for the selected system. Cracks, contamination, falls and drainage need assessment; resin bound does not repair a failing base.
Where water is intended to pass through the full build-up, the supporting layers and ground drainage must be designed together. Confirm the base specification for the intended traffic.
These need a separate review of waterproofing, drainage, exposure and wet slip requirements. Loose aggregate or ordinary compacted ground is not automatically a suitable laying surface.
Inspect the base for movement and damage, check levels at gates and thresholds, and agree repairs or replacement where needed. Clean and prepare the receiving surface, use a compatible primer where specified, and secure edge restraints. Confirm the weather and substrate conditions meet the resin manufacturer's application requirements before laying.
Resin bound blends aggregate with resin before trowelling. Resin bonded scatters stone onto an applied resin layer. They have different textures and drainage behaviour. Approve the actual resin bound system and sample, rather than buying on a generic description such as stone carpet or resin gravel.
Water can pass through a suitably specified resin bound layer, but the layers beneath determine its onward route. Over an impermeable base, falls and a suitable outlet remain essential. Agree the drainage design, edges and maintenance access before installation; do not assume that puddles or runoff will disappear.
Why people choose it
01
A trowelled stone surface with a blend and texture you can review on a physical sample.
02
Coordinate curves, borders, gates and adjoining paving with the drainage route.
03
Agree the base and surfacing for pedestrian or vehicle use before installation.
Custom & combinations
Send us a photo of any sample you'd like matched, or describe a combination of finishes you're after. Message the studio on WhatsApp — it's the fastest way to share a picture and get a straight answer.
Replies within studio hours, 7 days a week.
Process
A controlled, on-site sequence — each stage signed off before the next begins.
Confirm the intended loads, soundness, falls and water route; agree repairs and the full build-up.
Prepare the receiving base and set edges, thresholds and joint details to the approved layout.
Mix the specified dried aggregate and resin, then lay to the approved depth within the product's working conditions.
Protect the surface and release pedestrian and vehicle access only at the confirmed handover stages.




AI-generated finish illustrations for colour and texture reference.
At a glance
Investment
Published guide: AED 280–420 / m². The resin bound installation cost depends on the aggregate, area, traffic specification and base condition. Confirm whether groundworks, drainage, repairs and edging are included in the written quote, along with VAT treatment.
Aftercare
Sweep away sand, leaves and debris so the surface's pores and nearby outlets remain clear. Remove spills with a cleaner approved for the resin system. Follow the installer's method for washing; aggressive pressure cleaning or unapproved solvents can damage the surface. Report loose areas, damage or persistent ponding for assessment, and retain the aggregate blend reference for future repairs.
Planning access
Keep the surface closed during application and curing. Light pedestrian access, vehicle access and full loading are separate handover stages. The installer confirms each release time from the specified resin, site temperatures and application conditions; a dry-looking surface is not permission to drive on it. Include repairs and any new-base curing in the programme before arranging access.
Discuss your reopening dateProject enquiries
Dubai, Abu Dhabi, Sharjah and the wider UAE.
Send the emirate, approximate area, photos of the base and edges, and whether the surface will take people or vehicles. Include standing-water photos, gate and threshold levels, delivery access and your preferred completion date. We assess the base and drainage, review samples and confirm the installation scope in writing.
Your quote confirms materials and labour, repairs and preparation, access and protection, timing, curing, warranty terms, exclusions and VAT treatment.
Or call +971 50 311 9537
From the work
Three notes stay in view at once: the lead story, the neighbouring context, and the next surface waiting in the queue.
FAQ
Don't see your question? Email us — we read every one.
Yes. We assess resin bound driveway, path and walkway projects in Dubai and across the UAE. Vehicle use must be included in the brief so the base and surfacing can be specified for the actual loading.
Our published guide is AED 280–420 per m². Area, aggregate, resin, depth and the existing base affect the quote. Groundworks, drainage and edging can change the total substantially, so ask for the measured scope, exclusions and VAT treatment in writing.
Sometimes, subject to the concrete's condition and the selected system. The installer must assess stability, cracks, levels, preparation and the water outlet. Laying a porous finish over concrete does not make the concrete permeable.
Drainage depends on the full construction, falls and outlets. The resin bound layer can be porous, but blocked pores or an unsuitable base can still cause problems. Agree the water route before the installation is priced.
Specify a resin with documented suitability for the exposure. Poolside use also needs an agreed wet slip specification, drainage and compatible surrounding details. Texture alone is not proof of slip performance, and no universal no-fade claim applies to every resin.
Use the installer's written release times for the actual resin and site conditions. Pedestrian access, vehicle access and full loading can have different waiting periods. Keep vehicles off until their handover stage is approved.
Explore Halo services
If your plans include a full renovation, fitted joinery or an outdoor transformation, explore the relevant Halo service for your Dubai property.
Start with a sample
Book a free site visit. Bring your samples, references, and your room. We'll bring the trowel.