TZ1Read MoreRead Less
An ivory terrazzo base with cream, tan, sage, and charcoal chips for a light residential floor.
- Satin
- Ivory
- Fine chip
Supply & installation · Dubai & UAE
DecoPaint supplies and installs poured terrazzo flooring in Dubai, Abu Dhabi and across the UAE. Aggregate chips are mixed into a cement or epoxy binder, then the surface is ground and finished to reveal the pattern. For a hotel lobby, retail interior or villa entrance, we assess the base, agree the chip mix and joint layout, and quote the installation scope in writing.

Installation guide
Looking for terrazzo flooring contractors? Our service covers surface assessment, samples, preparation, pouring, grinding and finishing. We help you compare the proposed binder and build-up with your floor levels, use and programme before you approve the installation.
The base must be sound and compatible with the chosen terrazzo system. Moisture, strength, cracks and available depth are checked before the build-up is confirmed.
Existing finishes may need removal or preparation. We assess bonding, contamination and finished levels at doors, stairs and adjoining floors before recommending an overlay.
Confirm the proposed system's weight, thickness and support with the project engineer where required. Stair nosings and changes of level need agreed details.
Review the slab and screed, map cracks and joints, test moisture using the specified method, and agree any repairs or moisture-control measures. Mechanically prepare and prime the base as the selected system requires. Coordinate finished levels, divider strips and protection from other trades before pouring.
Both bind aggregate into a poured floor. Cement terrazzo and epoxy terrazzo have different depth, weight, curing and exposure requirements. The installer should identify the exact system, including any underlayment or membrane; one thickness or cure time cannot describe both.
Plan pour fields and divider strips with the floor drawing. Required structural and movement joints must be accommodated in the finish using the approved detail. Resolve thresholds, columns and adjoining materials before the chip mix is poured.
Why people choose it
01
Review aggregate, background and sheen together before committing to a full floor.
02
Coordinate divider strips, thresholds and adjoining finishes with the room's design.
03
Choose the finish around daily traffic and cleaning, with care instructions for the installed system.
Custom & combinations
Send us a photo of any sample you'd like matched, or describe a combination of finishes you're after. Message the studio on WhatsApp — it's the fastest way to share a picture and get a straight answer.
Replies within studio hours, 7 days a week.
Process
A controlled, on-site sequence — each stage signed off before the next begins.
Assess moisture, levels, cracks and joints; prepare the base and set out the agreed floor details.
Place the approved aggregate and binder mix to the specified build-up within the planned pour fields.
Wait for the selected binder to reach the manufacturer's required condition for grinding.
Expose the aggregate, fill surface voids as required and refine the floor to the approved sheen.
Apply the specified protective treatment, allow its cure and confirm the cleaning and reopening schedule.




AI-generated finish illustrations for colour and texture reference.
At a glance
Investment
Published guide: AED 480–860 / m². Your terrazzo flooring price is confirmed after the base, binder, aggregate and finishing scope are assessed. Request a measured installation quote with inclusions, exclusions and VAT treatment.
Aftercare
Remove grit regularly and use a neutral cleaner approved for the installed binder and sealer. Clean spills promptly; avoid acidic cleaners on marble-bearing terrazzo and unapproved abrasive products. Use entrance mats and furniture protection. Follow the handover advice for sealer renewal or professional refinishing; local repairs can remain visible.
Planning access
Allow for preparation, pouring, curing, grinding, finishing and the final sealer's cure. Readiness for grinding is different from readiness for occupants. The installer must confirm separate dates for light foot traffic, furniture and full commercial use for the chosen binder, sealer and site conditions. Keep other trades off the floor until the relevant stage is released.
Discuss your reopening dateProject enquiries
Dubai, Abu Dhabi, Sharjah and the wider UAE.
Send the project location, approximate area, floor plan, photos of the existing floor and intended use. Include your required opening date, threshold levels and reference chip mix. We review the base and samples, then confirm the proposed system, joint plan, measured scope and installation price.
Your quote confirms materials and labour, repairs and preparation, access and protection, timing, curing, warranty terms, exclusions and VAT treatment.
Or call +971 50 311 9537
From the work
Three notes stay in view at once: the lead story, the neighbouring context, and the next surface waiting in the queue.
FAQ
Don't see your question? Email us — we read every one.
Yes. DecoPaint provides terrazzo supply and installation for projects in Dubai, Abu Dhabi and the wider UAE. Send the area, floor plan, site photos and intended use so we can assess the installation scope.
Our published guide is AED 480–860 per m². The installed quote depends on the binder, aggregate, build-up, substrate work, divider strips, finish and access. Confirm inclusions, exclusions and VAT in your project quote; the guide is not a fixed rate for every floor.
Poured terrazzo is an aggregate-and-binder floor placed and ground on site. Terrazzo-effect paint and factory-made tiles have different construction and installation needs. This service page covers poured terrazzo installation.
The layout must accommodate required movement and structural joints. Decorative divider strips set out the pattern and pour fields, but do not automatically replace a movement-joint detail.
Do not assume an interior epoxy terrazzo system is suitable outside. UV exposure, moisture and temperature movement require a separately approved specification. Tell us about exterior or poolside use before a system is proposed.
Agree separate release dates for foot traffic, furniture and full operation. Binder cure, grinding, finishing and sealer cure all affect the programme. The installer confirms the dates for the actual system and site conditions before you book a reopening.
Start with a sample
Book a free site visit. Bring your samples, references, and your room. We'll bring the trowel.